Wind · NEMMCOCI Karma Pty Ltd as trustee for the CI Karma Trust · Wind Turbine - Onshore
14 Jun 2026 21:45 → 21 Jun 2026 21:45 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 09 Jun 2026
Notes
No verifiable plant-specific capex, commissioning date, or operating data could be located from the provided searches or additional searches. Internal server-side defaults were used only for wind O&M and capex fallback per instructions; capex remains unverified and is not reported. Site capacity was not available, so fixed OPEX annual total could not be calculated.