Wind · Kariboe Wind Farm Pty Ltd · Wind Turbine - Onshore
13 Jun 2026 22:05 → 14 Jun 2026 22:05 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
How this was derived |
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No project-specific greenfield capex announcement was found in the searched owner/developer sources. OX2 states the project is up to 225 MW wind plus up to 225 MW / 4-hour BESS, acquired from BayWa r.e. in mid-2025, with construction anticipated in 2028 and operations in late 2030. Because no official project investment figure was located, capex is left null rather than substituting an AEMO benchmark. Operating-cost defaults were not populated from a primary source and should be reviewed if needed.