Wind · Tilt Renewables Australia Pty Ltd · Wind Turbine - Onshore
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
I could not verify any Australian NEM generator record or any plant-specific construction/investment cost for a Juno Wind Farm owned by Tilt Renewables Australia Pty Ltd. The web results found a different 'Juno wind farm' in Spain, and Tilt Renewables’ current Australian portfolio pages returned other projects but not Juno. Because of that, I left capex and operating assumptions blank rather than infer values for a possibly mismatched asset.