Solar · Jindera Solar Farm Pty Ltd · Solar PV - Fixed
03 Jun 2026 22:20 → 04 Jun 2026 22:20 AEST
| Capex total (greenfield) |
$215.38M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,794,872
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$23,077
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Reported project capital investment of $168 million in the NSW Department of Planning and Environment assessment report and IPC media release; project described as a 120 MW AC solar farm with a 30 MW / 60 MWh battery. Jindera Solar Farm website indicates construction was expected to take up to 12 months and project lifespan 30 years. Fixed OPEX is set to the provided server-side fallback only because no plant-specific operating cost was found in the searched sources. No fuel cost or heat rate applies to solar PV.