Wind · Squadron Energy Services Pty Ltd · Wind Turbine - Onshore
14 Jun 2026 01:55 → 15 Jun 2026 01:55 AEST
| Capex total (greenfield) |
$2,900.84M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$7,252,110
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Project is a proposed 400 MW onshore wind farm with battery storage. Squadron Energy states the project currently comprises 65 wind turbines and battery energy storage. The strongest plant-specific cost figure found is a $2.75 billion green strategic alliance for wind turbine supply across three Squadron Energy projects (Uungula, Jeremiah, Spicers Creek), so it is not a Jeremiah-only total project cost; capex_total_aud is therefore based on the alliance figure and should be treated as an allocation proxy, not a site-specific full EPC cost. The site has a stated expected capacity of 400 MW and 65 turbines.