Solar · Enerparc Australia Pty Ltd · Solar PV - Single axis tracking
14 Jun 2026 06:05 → 15 Jun 2026 06:05 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$527.4k
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$21,097
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in the searched official/credible sources. The project was publicly described as a proposed 25 MW solar farm near Innes Park lodged by Enerparc Australia Pty Ltd in 2019, but the search results available here did not provide a total project investment figure. O&M and asset-life fields are generic solar PV assumptions; fixed OPEX annual value assumes 25 MW × AUD 20,000/MW-yr.