Wind · brightnightpower_NR · Wind Turbine - Onshore
21 Jun 2026 00:00 → 21 Jun 2026 23:59 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$11.01M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$63,303
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No project-specific greenfield capex announcement was found for Ilford Green Energy Hub in the available search results. Using AEMO/Aurecon GenCost 2024 onshore wind benchmark assumptions as fallback for O&M only. The project is publicly announced with a 174 MW onshore wind component and a 2029-10-01 online date. Fixed O&M annual cost is estimated from 2024 benchmark $60,011.49/MW-yr × 174 MW.