Ilford Green Energy Hub

Wind · brightnightpower_NR · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.53/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner brightnightpower_NR
Commissioned Oct 2029
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
21 Jun 2026 06:10 → 22 Jun 2026 06:10 AEST

Dispatch & revenue

21 Jun 2026 06:10 → 22 Jun 2026 06:10 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$11.01M

Shown in table
$11.01M (2026 real AUD)

Reported / source value
$10.44M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated the annual fixed O&M estimate by multiplying the per-MW benchmark by the 174 MW capacity.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 08 Jun 2026

Fixed OPEX / MW-yr
$63,303

Shown in table
$63.3k (2026 real AUD)

Reported / source value
$60.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used the benchmark O&M assumption from the AEMO/Aurecon 2024 review for onshore wind. The annual total O&M figure inferred in the report text corresponds to about $60,011.49/MW-year when divided by the 174 MW project capacity.

Reference
2024 Energy Technology Cost and Parameters Review (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific or wind-specific variable O&M benchmark was located in the search results, so the internal fallback was used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No project-specific greenfield capex announcement was found for Ilford Green Energy Hub in the available search results. Using AEMO/Aurecon GenCost 2024 onshore wind benchmark assumptions as fallback for O&M only. The project is publicly announced with a 174 MW onshore wind component and a 2029-10-01 online date. Fixed O&M annual cost is estimated from 2024 benchmark $60,011.49/MW-yr × 174 MW.