Ilford Green Energy Hub

Solar · brightnightpower_NR · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$14.55/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner brightnightpower_NR
Commissioned Apr 2029
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
13 Jun 2026 19:05 → 14 Jun 2026 19:05 AEST

Dispatch & revenue

13 Jun 2026 19:05 → 14 Jun 2026 19:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$14.55/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh
$14.55

Shown in table
$14.55 (2026 real AUD)

Reported / source value
$13.79 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provides the benchmark variable O&M for the solar PV review. Used as fallback only because no plant-specific O&M data was found.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield capex announcement or owner/government investment figure was found for Ilford Green Energy Hub or brightnightpower_NR in the searches performed. NEMStats identifies the site as publicly announced and gives 176 MW for the solar PV single-axis tracking component with a 2029-04-01 full commercial use date. Because no verified project cost was found, capex was left blank rather than estimated from benchmarks. AEMO/Aurecon 2024 indicates single-axis tracking has higher capital cost and maintenance than fixed-tilt, but no site-specific values were available. Asset life not verified from source.

Sources