Solar · Hopeland Solar Farm Pty Ltd as trustee for the Hopeland Solar Farm Trust · Solar PV - Fixed
01 Jun 2026 00:00 → 14 Jun 2026 23:30 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$18,987
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.21
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Public sources identify Hopeland as a 250 MWac solar farm with a 175 MW / 350 MWh BESS, owned by Pacific Partnerships, with construction anticipated to start in mid-2026 and operations expected in 2028. No plant-specific greenfield project cost was found in official owner/government sources, so capex was left blank rather than substituting a benchmark. The project appears to have been referred to in earlier materials as a proposed 300 MWdc/250 MWac solar farm; current owner materials use 250 MWac. Asset life set to a typical solar farm planning assumption, not a sourced site-specific value.