Hopeland Solar Farm

Solar · Hopeland Solar Farm Pty Ltd as trustee for the Hopeland Solar Farm Trust · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 336h
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.21/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Hopeland Solar Farm Pty Ltd as trustee for the Hopeland Solar Farm Trust
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
01 Jun 2026 00:00 → 14 Jun 2026 23:30 AEST

Dispatch & revenue

01 Jun 2026 00:00 → 14 Jun 2026 23:30 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.21/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$1,160,338

Shown in table
$1.16M (2026 real AUD)

Reported / source value
$1.10M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$18,987

Shown in table
$19.0k (2026 real AUD)

Reported / source value
$18.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.21

Shown in table
$0.21 (2026 real AUD)

Reported / source value
$0.20 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Public sources identify Hopeland as a 250 MWac solar farm with a 175 MW / 350 MWh BESS, owned by Pacific Partnerships, with construction anticipated to start in mid-2026 and operations expected in 2028. No plant-specific greenfield project cost was found in official owner/government sources, so capex was left blank rather than substituting a benchmark. The project appears to have been referred to in earlier materials as a proposed 300 MWdc/250 MWac solar farm; current owner materials use 250 MWac. Asset life set to a typical solar farm planning assumption, not a sourced site-specific value.

Sources