Hopeland Solar Farm

Solar · Hopeland Solar Farm Pty Ltd as trustee for the Hopeland Solar Farm Trust · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.21/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates —

DUID —
Owner Hopeland Solar Farm Pty Ltd as trustee for the Hopeland Solar Farm Trust
Commissioned —
Expected closure —
Closure date —
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM —
Module / inverter supplier —
Inverter OEM —
Inverter model —
Stats window
24 Sep 2026 05:20 → 25 Sep 2026 05:20 AEST

Dispatch & revenue

24 Sep 2026 05:20 → 25 Sep 2026 05:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.21/MWh
Capex total (greenfield)
—
Capex refurbishment
—
Capex / MW
$1,160,338

Shown in table
$1.16M (2026 real AUD)

Reported / source value
$1.10M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr
$18,987

Shown in table
$19.0k (2026 real AUD)

Reported / source value
$18.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.21

Shown in table
$0.21 (2026 real AUD)

Reported / source value
$0.20 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Public sources identify Hopeland as a 250 MWac solar farm with a 175 MW / 350 MWh BESS, owned by Pacific Partnerships, with construction anticipated to start in mid-2026 and operations expected in 2028. No plant-specific greenfield project cost was found in official owner/government sources, so capex was left blank rather than substituting a benchmark. The project appears to have been referred to in earlier materials as a proposed 300 MWdc/250 MWac solar farm; current owner materials use 250 MWac. Asset life set to a typical solar farm planning assumption, not a sourced site-specific value.