Hookey Creek Hybrid - Solar And BESs - KCI

Solar · Zen Energy Future Pty Ltd · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Zen Energy Future Pty Ltd
Commissioned Mar 2029
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
14 Jun 2026 11:55 → 15 Jun 2026 11:55 AEST

Dispatch & revenue

14 Jun 2026 11:55 → 15 Jun 2026 11:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)

How this was derived
Owner page confirms the project but does not disclose construction cost.

Reference
ZEBRE PROJECTS - ZEN Energy (medium confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW
$1,331,967

Shown in table
$1.33M (2026 real AUD)

Reported / source value
$1.30M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$13,689

Shown in table
$13.7k (2026 real AUD)

Reported / source value
$13.4k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as the closest published solar PV O&M benchmark.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield capex announcement was found for Hookey Creek Hybrid / Hookey Creek Solar Farm and BESS in available web results. Project description confirms a 100 MW solar farm and 200 MW/4-8 hour BESS. In the absence of a reported project capex, only the AEMO/Aurecon utility-scale solar PV benchmark was used for operating assumptions: single-axis tracking, fixed O&M $13,360/MWp-year, 30-year design/technical life, no variable O&M. No refurbishment capex identified.