Hills of Gold Wind Farm

Wind · Hills of Gold Wind Farm Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.53/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Hills of Gold Wind Farm Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
13 Jun 2026 09:05 → 14 Jun 2026 09:05 AEST

Dispatch & revenue

13 Jun 2026 09:05 → 14 Jun 2026 09:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$871.73M

Shown in table
$871.73M (2026 real AUD)

Reported / source value
$826.40M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported greenfield project investment for the original 64-turbine project.

Reference
Statement of Reasons for Decision – Hills of Gold Wind Farm SSD-9679 (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW
$2,343,360

Shown in table
$2.34M (2026 real AUD)

Reported / source value
$2.22M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific O&M source found; internal fallback used.

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source found; internal fallback used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific reported project investment of approximately A$826.4 million was identified in NSW IPC documentation for the original 64-turbine / 384 MW project. The approved project is 372 MW with 62 turbines and a 100 MW / 400 MWh battery, so capex_per_mw is calculated on the reported 384 MW basis from the source. No separate plant-specific O&M or refurbishment data was found; internal defaults used for wind O&M. Project ownership appears to have transferred from ENGIE to Someva in August 2025, but the reported capex figure predates that transfer and reflects the original greenfield project cost.

Sources