Wind · Hills of Gold Wind Farm Pty Ltd · Wind Turbine - Onshore
13 Jun 2026 09:05 → 14 Jun 2026 09:05 AEST
| Capex total (greenfield) |
$871.73M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,343,360
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific reported project investment of approximately A$826.4 million was identified in NSW IPC documentation for the original 64-turbine / 384 MW project. The approved project is 372 MW with 62 turbines and a 100 MW / 400 MWh battery, so capex_per_mw is calculated on the reported 384 MW basis from the source. No separate plant-specific O&M or refurbishment data was found; internal defaults used for wind O&M. Project ownership appears to have transferred from ENGIE to Someva in August 2025, but the reported capex figure predates that transfer and reflects the original greenfield project cost.