Hexham

Wind · Wind Prospect WA Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.53/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Wind Prospect WA Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
17 Jun 2026 00:00 → 17 Jun 2026 23:59 AEST

Dispatch & revenue

17 Jun 2026 00:00 → 17 Jun 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
The project is still in planning / EES stage and no reliable plant-specific greenfield construction cost was found in official owner, government, or project-finance sources. The owner’s site materials indicate up to 106 turbines and a total generation capacity of up to 741 MW, with construction and commissioning targeted for 2027-2029. Because no project-specific capex figure was located, capex fields remain null rather than substituting an AEMO benchmark. For O&M, no plant-specific public estimate was found; a fallback value is not populated here because the request prioritised research-backed assumptions and the project is not yet operating. Wind has no fuel cost or heat rate, and emissions intensity is zero for operational generation.

Sources