17 Jun 2026 01:00 → 18 Jun 2026 01:00 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
The project is still in planning / EES stage and no reliable plant-specific greenfield construction cost was found in official owner, government, or project-finance sources. The owner’s site materials indicate up to 106 turbines and a total generation capacity of up to 741 MW, with construction and commissioning targeted for 2027-2029. Because no project-specific capex figure was located, capex fields remain null rather than substituting an AEMO benchmark. For O&M, no plant-specific public estimate was found; a fallback value is not populated here because the request prioritised research-backed assumptions and the project is not yet operating. Wind has no fuel cost or heat rate, and emissions intensity is zero for operational generation.