13 Jun 2026 18:20 → 14 Jun 2026 18:20 AEST
| Capex total (greenfield) |
$1,757.80M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,200,000
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$46.36M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 08 Jun 2026
Notes
No project-specific greenfield capex announcement for Harrami Wind Farm was found in searched sources. Capacity inferred from a NEM generator listing as 799 MW. Capex therefore uses the server-side onshore wind fallback benchmark (estimated, not reported). Fixed O&M annual cost is calculated from the fallback $55,000/MW-yr multiplied by 799 MW.