Gurambilbarra Energy Hub

Other Generators · 365 Future Energy · Other - Other

Development AEMO: Publicly Announced Other - Other NEM data · 7 days
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$2.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner 365 Future Energy
Commissioned
Expected closure
Closure date
Technology Other - Other
Fuel Other - Other
Equipment OEM
Equipment type / model
Stats window
08 Jun 2026 02:55 → 15 Jun 2026 02:55 AEST

Dispatch & revenue

08 Jun 2026 02:55 → 15 Jun 2026 02:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.00/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$2,109,705

Shown in table
$2.11M (2026 real AUD)

Reported / source value
$2.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$2.00

Shown in table
$2.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
365 Future Energy describes Gurambilbarra Energy Hub as a 165 MW PV solar project plus 400 MWh BESS in Townsville, with DA and initial Powerlink approval secured and a targeted mid-2026 build start. I could not find a credible project-specific greenfield investment/capex announcement from the owner/developer or government, so capex was not estimated from benchmarks here. Internal fallback values were not applied because the request prioritised verified plant-specific evidence and none was found.