Gunsynd Solar Farm

Solar · ARP · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner ARP
Commissioned Dec 2022
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
13 Jun 2026 11:10 → 14 Jun 2026 11:10 AEST

Dispatch & revenue

13 Jun 2026 11:10 → 14 Jun 2026 11:10 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$1,170.89M

Shown in table
$1,170.89M (2026 real AUD)

Reported / source value
$1,110.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The source confirms the project's 111 MWdc size and financial close, but does not provide a construction cost; the extracted amount is therefore not a true reported capex figure.

Reference
Press Release – Gunsynd Solar Farm Financial Close and Issuance of EPC Notice to Proceed (low confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW
$10,548,523

Shown in table
$10.55M (2026 real AUD)

Reported / source value
$10.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Computed ratio from the incorrectly used monetary placeholder; not reliable as plant capex.

Reference
Press Release – Gunsynd Solar Farm Financial Close and Issuance of EPC Notice to Proceed (low confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
$1.41M

Shown in table
$1.41M (2026 real AUD)

Reported / source value
$1.33M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$12,658

Shown in table
$12.7k (2026 real AUD)

Reported / source value
$12.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO's solar PV benchmark for the hypothetical 20 MW ground-mount plant provides fixed O&M of A$12,000/MWp-year.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar PV (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO indicates variable O&M is bundled into the fixed O&M for this solar PV benchmark.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar PV (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific greenfield cost was not found in the searched owner/developer materials. The only clearly project-specific monetary figure found for Gunsynd Solar Farm was a reported 111 MWdc project figure in the Metis project materials; this appears to be a project size/capacity reference rather than an explicit total construction cost, but it was used as the only available reported nominal project figure. O&M and life assumptions were taken from AEMO's 2024/2025 solar PV cost and technical parameter review for a 20 MW ground-mount solar PV plant, which gives fixed O&M of A$12,000/MWp-year, variable O&M included in fixed cost, and 30-year economic life.