Solar · Canadian Solar · Solar PV - Fixed
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST
| Capex total (greenfield) |
$686.71M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,746,835
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$18,987
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.21
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Plant-specific reported project cost from NSW Government planning announcement covers the 250 MW solar farm and 150 MW / 600 MWh battery energy storage system. Capex per MW is calculated on the 250 MW solar farm capacity; capex per MWh is calculated on the 600 MWh battery capacity and therefore is not directly comparable to solar-only capex benchmarks. No separate plant-specific fixed O&M or variable O&M was found, so internal solar PV defaults were used for O&M. Operational life reported in project materials is 35 years.