Wind · ARK Energy Corporation Pty Ltd · Wind Turbine - Onshore
14 Jun 2026 10:15 → 15 Jun 2026 10:15 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Ark Energy’s current project pages and EPA Tasmania material confirm Guildford Wind Farm is a proposed onshore wind project in north-west Tasmania, with up to 80 turbines and up to 450 MW capacity in current Ark Energy material; earlier EPA material described up to 300 MW. No project-specific greenfield investment or total construction cost was found in the searched owner/government sources, so capex could not be reported as a plant-specific figure. AEMO/CSIRO benchmark costs were not substituted because the capex search priority required plant-specific evidence first.