Gregadoo Solar Farm

Solar · Gregadoo Solar Farm Pty Ltd · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 521h
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Gregadoo Solar Farm Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
01 Jun 2026 00:00 → 22 Jun 2026 16:30 AEST

Dispatch & revenue

01 Jun 2026 00:00 → 22 Jun 2026 16:30 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$39.68M

Shown in table
$39.68M (2026 real AUD)

Reported / source value
$30.00M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
NSW planning document provides a reported lower-bound capital investment threshold for the original project.

Reference
Gregadoo Solar Farm (medium confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW
$844,309

Shown in table
$844.3k (2026 real AUD)

Reported / source value
$638.3k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$825.4k

Shown in table
$825.4k (2026 real AUD)

Reported / source value
$624.0k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark annual O&M for the hypothetical 40 MW ground-mount solar PV project.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 08 Jun 2026

Fixed OPEX / MW-yr
$15,873

Shown in table
$15.9k (2026 real AUD)

Reported / source value
$12.0k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon benchmark fixed O&M for a hypothetical 40 MW ground-mount solar PV project.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark specifies no separate variable O&M cost for the hypothetical solar PV project.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Project website identifies Gregadoo Solar Farm as ~65 MWac and initially approved in 2018, with construction planned for 2025-2026. NSW planning documents state the original development had an estimated capital investment cost greater than $30 million for a 47 MW solar farm. O&M defaults were taken from AEMO/Aurecon 2024 solar PV benchmark for a 40 MW ground-mount project; the benchmark used is for a hypothetical NEM project and is not plant-specific. The capex figure is a lower-bound reported threshold rather than a precise total project cost.

Sources