Solar · Gregadoo Solar Farm Pty Ltd · Solar PV - Fixed
21 Jun 2026 14:55 → 22 Jun 2026 14:55 AEST
| Capex total (greenfield) |
$39.68M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$844,309
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$825.4k
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$15,873
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Project website identifies Gregadoo Solar Farm as ~65 MWac and initially approved in 2018, with construction planned for 2025-2026. NSW planning documents state the original development had an estimated capital investment cost greater than $30 million for a 47 MW solar farm. O&M defaults were taken from AEMO/Aurecon 2024 solar PV benchmark for a 40 MW ground-mount project; the benchmark used is for a hypothetical NEM project and is not plant-specific. The capex figure is a lower-bound reported threshold rather than a precise total project cost.