Greater Southern Offshore Wind - KCI

Wind · Greater Southern Offshore Wind Farm Project Co Pty Ltd · Wind Turbine - Offshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 9h
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.84/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Greater Southern Offshore Wind Farm Project Co Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Offshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
22 Jun 2026 00:00 → 22 Jun 2026 08:55 AEST

Dispatch & revenue

22 Jun 2026 00:00 → 22 Jun 2026 08:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (offshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.84/MWh
Capex total (greenfield)
$8,438.82M

Shown in table
$8,438.82M (2026 real AUD)

Reported / source value
$8,000.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as a non-project-specific fallback because no owner/developer announcement with total investment was found.

Reference
Building an offshore wind industry (low confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW
$3,835,827

Shown in table
$3.84M (2026 real AUD)

Reported / source value
$3.64M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$94,937

Shown in table
$94.9k (2026 real AUD)

Reported / source value
$90.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.84

Shown in table
$0.84 (2026 real AUD)

Reported / source value
$0.80 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
No plant-specific capex announcement was found for Greater Southern Offshore Wind - KCI. The capex_total_aud uses the DCCEEW offshore wind industry guidance that a single 2 GW offshore wind project can cost between $8 billion and $10 billion; $8 billion was used as the lower bound proxy only because no owner/developer project-specific investment figure was located. This should be reviewed and replaced if a project-specific announcement is found. Capacity was inferred at 2,200 MW from public references to the Great Southern/Greater Southern offshore wind project family; if the registered KCI capacity differs, per-MW values should be recalculated. OPEX values are server-side defaults, not source-verified plant-specific estimates.