14 Jun 2026 15:45 → 15 Jun 2026 15:45 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Project-specific greenfield capex could not be verified from owner/developer or government sources in available search results. The project appears to have been proposed at 132 MW and later paused/cancelled, so no commissioning date or operating asset details were verified. Internal default O&M values were retained where no site-specific source was found.