Goyder North Renewable Energy Facility

Wind · Neoen Australia · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 3h
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.50/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Neoen Australia
Commissioned Dec 2028
Expected closure 2059
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
15 Jun 2026 00:00 → 15 Jun 2026 02:55 AEST

Dispatch & revenue

15 Jun 2026 00:00 → 15 Jun 2026 02:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield)

How this was derived
Confirms project scale but does not state capex or total investment.

Reference
Neoen signs 100 MW renewable energy baseload agreement to supply power to BHP in South Australia (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield CAPEX announcement was found for Goyder North Renewable Energy Facility. Sources confirm the project is part of Neoen’s Goyder Renewables Zone and that Goyder North Wind Farm has planning consent for up to 135 turbines, equivalent to approximately 1 GW of wind generation, but they do not disclose a total project cost. Because no reported project-specific investment figure was found, no CAPEX estimate has been inserted. For fallback O&M and other technical assumptions, AEMO/CSIRO GenCost 2024-25 sources were located, but the relevant onshore wind capex/O&M table values were not cleanly extractable in the available search snippets; manual review of the cited PDF is recommended before using benchmark values. Onshore wind has zero direct fuel cost and zero direct emissions in operation.