Wind · Neoen Australia · Wind Turbine - Onshore
08 Jun 2026 04:30 → 15 Jun 2026 04:30 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield CAPEX announcement was found for Goyder North Renewable Energy Facility. Sources confirm the project is part of Neoen’s Goyder Renewables Zone and that Goyder North Wind Farm has planning consent for up to 135 turbines, equivalent to approximately 1 GW of wind generation, but they do not disclose a total project cost. Because no reported project-specific investment figure was found, no CAPEX estimate has been inserted. For fallback O&M and other technical assumptions, AEMO/CSIRO GenCost 2024-25 sources were located, but the relevant onshore wind capex/O&M table values were not cleanly extractable in the available search snippets; manual review of the cited PDF is recommended before using benchmark values. Onshore wind has zero direct fuel cost and zero direct emissions in operation.