Gol Gol Wind Farm

Wind · Squadron Energy Developments Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.50/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Squadron Energy Developments Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
14 Jun 2026 03:50 → 15 Jun 2026 03:50 AEST

Dispatch & revenue

14 Jun 2026 03:50 → 15 Jun 2026 03:50 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield capex announcement was found in official owner/government sources. Public sources confirm the project is proposed at up to 840 MW with 120 turbines and remains in planning; therefore capex was not inferred from benchmarks. No verified plant-specific O&M or performance assumptions were found in the searched sources, so those fields were left null. Project status and capacity suggest the figures are pre-construction and subject to change.