Solar · Elgin Energy Pty Ltd · Solar PV - Single axis tracking
07 Jun 2026 23:00 → 14 Jun 2026 23:00 AEST
| Capex total (greenfield) |
$160.34M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,672,293
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh default |
$0.25
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
No plant-specific CAPEX announcement from Elgin Energy was found in the available searches beyond the NSW IPCN approval materials. The IPCN statement of reasons and applicant presentation state the project represents a $152 million investment and comprise a 60 MW solar farm plus a 60 MW / 120 MWh battery. Capex_per_mw_aud is calculated on the solar farm capacity only; capex_per_mwh_aud is calculated on battery energy capacity only for reference, but the project-level investment figure covers the combined solar-plus-battery project, not a stand-alone solar DUID. O&M values were not project-specific and no reliable plant-specific operating cost data was found in the searched sources.