Glanmire Solar Farm

Solar · Elgin Energy Pty Ltd · Solar PV - Single axis tracking

Development AEMO: Anticipated Solar - Solar NEM data · 7 days
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.25/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Anticipated
Project status Development (AI)

Coordinates

DUID
Owner Elgin Energy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
07 Jun 2026 23:00 → 14 Jun 2026 23:00 AEST

Dispatch & revenue

07 Jun 2026 23:00 → 14 Jun 2026 23:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$160.34M

Shown in table
$160.34M (2026 real AUD)

Reported / source value
$152.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Commission news release confirms the project investment and configuration.

Reference
Glanmire Solar Farm Approved Subject To Strict Conditions And Increased Setbacks (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW
$2,672,293

Shown in table
$2.67M (2026 real AUD)

Reported / source value
$2.53M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Per-MW figure is derived from the stated 60 MW solar capacity.

Reference
Glanmire Solar Farm Approved Subject To Strict Conditions And Increased Setbacks (medium confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
No plant-specific CAPEX announcement from Elgin Energy was found in the available searches beyond the NSW IPCN approval materials. The IPCN statement of reasons and applicant presentation state the project represents a $152 million investment and comprise a 60 MW solar farm plus a 60 MW / 120 MWh battery. Capex_per_mw_aud is calculated on the solar farm capacity only; capex_per_mwh_aud is calculated on battery energy capacity only for reference, but the project-level investment figure covers the combined solar-plus-battery project, not a stand-alone solar DUID. O&M values were not project-specific and no reliable plant-specific operating cost data was found in the searched sources.

Sources