Solar · Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust · Solar PV - Fixed
13 Jun 2026 19:55 → 14 Jun 2026 19:55 AEST
| Capex total (greenfield) |
$717.21M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$4,523,662
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$18,443
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.20
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Project-specific estimated development cost of AUD 700 million (excl GST) was found in a NSW Planning Portal pre-development application for Garoo Solar Farm and BESS. The site page and planning portal indicate the project includes solar and BESS; the reported cost appears to cover the combined development, not solar-only. Solar capacity is shown as 155 MW on the planning portal and about 134 MW AC on the project website; the NEM listing shows 160 MW. Capacity inconsistencies mean capex_per_mw is based on the 155 MW planning-portal figure as the closest official project capacity reference, but should be reviewed. No separate refurbishment cost was identified. Operating cost defaults were used for fixed/variable O&M because no plant-specific O&M source was found. Asset life assumed at 30 years as a typical utility-scale solar PV default.