Solar · Edify Energy Pty Ltd · Solar PV - Single axis tracking
13 Jun 2026 21:25 → 14 Jun 2026 21:25 AEST
| Capex total (greenfield) |
$474.68M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$3,164,557
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Edify’s CIS announcement refers to the combined Ganymirra and Majors Creek projects and states they involve a $450m injection into local community, First Nations business, local employment and local supply chains. The source does not explicitly state this is the full greenfield plant capital cost, so capex is treated as the best available reported project investment figure for the combined hybrid development, not as a plant-only EPC cost. Capacity used for per-MW calculation is the combined 150 MW Ganymirra share referenced by Edify, yielding $3.0m/MW. No plant-specific fixed OPEX or specific greenfield capex for Ganymirra alone was found; variable OPEX fallback used.