Solar · FRASER COAST SOLAR DEVELOPMENT PTY LTD · Solar PV - Single axis tracking
13 Jun 2026 14:00 → 14 Jun 2026 14:00 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$21,097
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
I could not find a plant-specific reported greenfield capex for Fraser Coast Hybrid Plant from the owner/developer or government sources. Public sources confirm the project is a hybrid solar PV + BESS development by Fraser Coast Solar Development Pty Ltd, with Naturgy/Global Power Generation ownership and later EPBC referral details indicating a Fraser Coast Photovoltaic Solar and Battery Energy Storage System Project near Teebar, QLD. Because no reported project cost was found, capex remains unset rather than using an AEMO benchmark. Capacity and commissioning date were not reliably confirmed from primary sources in the search results, so fixed OPEX annual value was not calculated.