Wind · Forsayth Wind Farm Pty Ltd · Wind Turbine - Onshore
13 Jun 2026 16:45 → 14 Jun 2026 16:45 AEST
| Capex total (greenfield) |
$353.11M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$4,708,098
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific capex was not found in official owner/government materials. A pre-fetched source summarises a reported $250 million investment for Forsayth Wind Farm; this was used as the best available reported greenfield figure. Capacity is inconsistently reported in sources; capex_per_mw assumes 75 MW based on project profile references. No verified operating O&M data found for this specific asset, so server fallback defaults were retained for O&M.