Forbes Solar Farm & BESS

Solar · Forbes Solar Farm Pty Ltd ATF Forbes Genesis Project Trust · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.26/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Forbes Solar Farm Pty Ltd ATF Forbes Genesis Project Trust
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
14 Jun 2026 13:05 → 15 Jun 2026 13:05 AEST

Dispatch & revenue

14 Jun 2026 13:05 → 15 Jun 2026 13:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)

How this was derived
No project-specific total investment / construction cost was found in searched official and industry sources.

Capex refurbishment
Capex / MW
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$21,097

Shown in table
$21.1k (2026 real AUD)

Reported / source value
$20.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
No plant-specific greenfield capex announcement was found in the available search results. NSW planning sources confirm the project scope and capacity, but do not provide a total investment figure. Using internal fallback O&M defaults only where no project-specific source was located. The project appears to be under assessment / in EIS preparation rather than operating, so operating assumptions are indicative only.

Sources