Everleigh Solar Farm & BESS - KCI

Solar · Everleigh Solar Park Pty Ltd · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.20/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Everleigh Solar Park Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST

Dispatch & revenue

13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.20/MWh
Capex total (greenfield)

How this was derived
The owner site does not disclose a total project investment figure.

Reference
HOME - Everleigh Solar Farm (high confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW
$1,127,049

Shown in table
$1.13M (2026 real AUD)

Reported / source value
$1.10M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Capex per MW cannot be derived without a verified total investment and confirmed capacity used for the registered unit.

Reference
HOME - Everleigh Solar Farm (high confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$18,000

Shown in table
$18.0k (2026 real AUD)

Variable OPEX / MWh
$0.20

Shown in table
$0.20 (2026 real AUD)

Reported / source value
$0.20 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
User-provided fallback applied.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
No plant-specific greenfield capex announcement was found in the searched owner/developer and public results. The project website confirms the Everleigh Solar Farm and BESS exists as a Queensland project and states construction is expected to begin in 2026, but it does not disclose total project investment. A public RPS page cites Everleigh Solar Farm as 119MW with 100MW/200MWh BESS, but this was not used as a capex source. Because no verified project-specific investment figure was found, capex fields remain null and should be reviewed if an owner, government, or finance announcement becomes available. Operating assumptions were not sourced beyond the provided internal fallback; only the provided variable OPEX fallback was populated.

Sources