Solar · Everleigh Solar Park Pty Ltd · Solar PV - Fixed
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,127,049
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh |
$0.20
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in the searched owner/developer and public results. The project website confirms the Everleigh Solar Farm and BESS exists as a Queensland project and states construction is expected to begin in 2026, but it does not disclose total project investment. A public RPS page cites Everleigh Solar Farm as 119MW with 100MW/200MWh BESS, but this was not used as a capex source. Because no verified project-specific investment figure was found, capex fields remain null and should be reviewed if an owner, government, or finance announcement becomes available. Operating assumptions were not sourced beyond the provided internal fallback; only the provided variable OPEX fallback was populated.