| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Project appears to be early-stage / not yet built; official project pages describe up to 96 turbines and approximately 700 MW, with SEARs issued in March 2024. No project-specific greenfield capex announcement was found in official owner/developer/government sources, so capex remains unpopulated rather than inferred from benchmarks. As a fallback, wind O&M and capex benchmarks are available in AEMO/Aurecon 2024 cost review, but no benchmark values were applied here because the capex priority required a plant-specific announcement first and the user requested normalised type wind_onshore without a confirmed capacity field for per-MW conversion. Variable O&M fallback of AUD 0.50/MWh and zero emissions were retained from provided defaults.