Eurimbula Solar Farm

Solar · Unitedgreen_NR · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 30 days
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.26/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Unitedgreen_NR
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
23 May 2026 08:30 → 22 Jun 2026 08:30 AEST

Dispatch & revenue

23 May 2026 08:30 → 22 Jun 2026 08:30 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)
$2,049.18M

Shown in table
$2,049.18M (2026 real AUD)

Reported / source value
$2,000.00M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Project presentation states approximately A$2 billion in capital expenditure for the Eurimbula hybrid project.

Reference
Elements Green - Eurimbula (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW
$2,944,225

Shown in table
$2.94M (2026 real AUD)

Reported / source value
$2.87M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated capex per MW using quoted project capital expenditure divided by the solar PV capacity provided in the presentation.

Reference
Elements Green - Eurimbula (medium confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$14.26M

Shown in table
$14.26M (2026 real AUD)

Reported / source value
$13.92M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$20,492

Shown in table
$20.5k (2026 real AUD)

Reported / source value
$20.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific O&M disclosed; used provided server-side default for utility-scale solar PV.

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M disclosed; used provided server-side default.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Plant-specific capex not found directly from owner/developer press release, but Elements Green project material presented to Gladstone Regional Council states ~A$2bn in capital expenditure for the Eurimbula project (696MWp solar PV + 666MW BESS). Capacity-matched capex_per_mw calculated using 696 MW PV nameplate only; this likely overstates solar-only capex because the quoted figure appears to cover the broader hybrid project including BESS. No refurbishment cost found. O&M, variable OPEX, and asset life are technology-default estimates for utility-scale single-axis tracking solar PV.

Sources