Solar · Elgin Energy Pty Ltd · Solar PV - Fixed
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh |
$0.21
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
I could not verify a plant-specific greenfield capital cost for Elaine Solar Farm & BESS Hybrid from official owner/developer disclosures in the available search results. The Victorian planning permit pages confirm the project and later BESS amendment, and external reporting confirms the solar project is 150 MW with a 250 MWh BESS and expected COD in 2026-2027, but no source-backed total capex figure was found. Internal server-side defaults were not used for capex because a project-specific figure was not located. O&M values also were not source-verified from AEMO/CSIRO in the accessible results.