Solar · Voltere Pty Ltd. · Solar PV - Fixed
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST
| Capex total (greenfield) |
$896.62M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,561,784
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$18,987
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.21
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific greenfield development cost found in the project scoping report for the Edderton Solar Project, which states an estimated development cost of approximately $850 million. The report describes the project as a 350 MWac solar farm and notes Voltere Pty Ltd. as the proponent. No separate plant-specific operating cost or commissioned date was found in the search results; internal defaults were used for O&M where applicable, except fuel/heat rate which are not relevant for solar PV.