Edderton Hybrid Faciility - Solar

Solar · Voltere Pty Ltd. · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 2h
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.21/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates —

DUID —
Owner Voltere Pty Ltd.
Commissioned —
Expected closure —
Closure date —
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM —
Module / inverter supplier —
Inverter OEM —
Inverter model —
Stats window
26 Sep 2026 00:00 → 26 Sep 2026 02:00 AEST

Dispatch & revenue

26 Sep 2026 00:00 → 26 Sep 2026 02:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.21/MWh
Capex total (greenfield)
$896.62M

Shown in table
$896.62M (2026 real AUD)

Reported / source value
$850.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Project-specific estimated development cost for the Edderton Solar Project.

Reference
Edderton Solar Project – Scoping Report (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
—
Capex / MW
$2,561,784

Shown in table
$2.56M (2026 real AUD)

Reported / source value
$2.43M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived capex intensity using reported total cost and 350 MW project capacity from the scoping report.

Reference
Edderton Solar Project – Scoping Report (medium confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr
$18,987

Shown in table
$19.0k (2026 real AUD)

Reported / source value
$18.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific O&M source found in search results; used provided server-side default.

Variable OPEX / MWh
$0.21

Shown in table
$0.21 (2026 real AUD)

Reported / source value
$0.20 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source found in search results; used provided server-side default.

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Plant-specific greenfield development cost found in the project scoping report for the Edderton Solar Project, which states an estimated development cost of approximately $850 million. The report describes the project as a 350 MWac solar farm and notes Voltere Pty Ltd. as the proponent. No separate plant-specific operating cost or commissioned date was found in the search results; internal defaults were used for O&M where applicable, except fuel/heat rate which are not relevant for solar PV.

Sources