Solar · Samsung C&T · Solar PV - Single axis tracking
11 Jun 2026 19:00 → 18 Jun 2026 19:00 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh default |
$0.25
Shown in table |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Publicly available search results identified the project size (300 MW solar PV plus 150 MW / 300 MWh BESS) and owner/developer, but I could not find a project-specific greenfield construction/investment cost from Samsung C&T, government, or other primary sources. Per instructions, no AEMO benchmark capex was used in place of a reported project cost. If you want, I can do a second-pass search for development rights sale documents or planning filings that may include a cost figure.