Solar · ib vogt GmbH / Sun Spot 4 · Solar PV - Single axis tracking
14 Jun 2026 21:05 → 15 Jun 2026 21:05 AEST
| Capex total (greenfield) |
$97.44M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,771,562
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$25,641
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.32
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific construction cost of approximately A$76 million was reported in NSW planning documents based on information provided by ib vogt. The planning material also describes the project as a 55 MW solar farm with energy storage, but the publicly found cost figure appears to relate to the solar farm project as described in the 2020-2021 assessment documents. Fixed O&M was not found as a plant-specific value, so the internal fallback was used. The AEMO/Aurecon 2024 review indicates single-axis tracking has higher capital and maintenance requirements than fixed-tilt and provides generic O&M context, but was not used for reported capex.