Dumaresq Solar Farm

Solar · Dumaresq Solar Farm Pty Limited · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.26/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Dumaresq Solar Farm Pty Limited
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
14 Jun 2026 13:05 → 15 Jun 2026 13:05 AEST

Dispatch & revenue

14 Jun 2026 13:05 → 15 Jun 2026 13:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)

How this was derived
Project identification only; no cost figure disclosed on the site.

Reference
Dumaresq Solar Farm (low confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$21,097

Shown in table
$21.1k (2026 real AUD)

Reported / source value
$20.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 07 Jun 2026

Notes
No plant-specific greenfield capex announcement was found in the searched sources. The project is currently documented in NSW Government planning materials as a proposed 190 MW solar PV facility with up to 190 MW / 760 MWh BESS. Internal fallback capex/O&M defaults were used for solar_tracking because no reported owner/developer project cost was located. fixed_opex_annual_aud is not populated because capacity was not provided by the user and should be calculated once capacity is confirmed.