01 Jun 2026 00:00 → 15 Jun 2026 05:40 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
MMG has publicly stated it is investigating the feasibility of building a wind farm at Dugald River, but the available sources do not provide a plant-specific greenfield construction cost, capacity, or commissioning date. The EPBC referral indicates a proposed project of up to 24 x 6 MW wind turbine generators (up to 144 MW) with ancillary infrastructure, but no capital cost figure was found in the accessible public documents. Internal technology defaults were used only for fallback operating assumptions.