| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,127,049
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$18,443
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.20
Shown in table Reported / source value |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific greenfield CAPEX announcement was found in the searched owner/developer/government sources. Public sources confirm Dingo Solar Farm is an 85 MW project in Dingo, QLD, under development, with ESCO Pacific as owner/developer in NEM datasets. In the absence of a project-specific investment figure, server-side fallback CAPEX was not applied in this output per user instruction; O&M and life assumptions use technology defaults/industry review context.