Devlins Wind Farm

Wind · Devlins Bridge Wind Farm Holdco Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
663 MW
Researched capacity
Est. SRMC
$0.50/MWh
Key information
Capacity (AI)
663 MW

AEMO spreadsheet entry for Devlins Wind Farm lists 662.70 MW (used only as a fallback because no project-specific public capacity source was found in the provided results).

AEMO status Publicly Announced
Project status Development (AI)

AEMO spreadsheet lists the asset as "Publicly Announced"; no separate primary-source evidence of construction or operation was found.

Coordinates

DUID
Owner Devlins Bridge Wind Farm Holdco Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
663 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield)
$1,537.91M

Shown in table
$1,537.91M (2026 real AUD)

Reported / source value
$1,457.94M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
No project-specific greenfield capex announcement was found in official owner, government, or project-finance sources. The project website identifies Devlins Bridge Wind Farm as a 590 MW onshore wind project in NSW, with construction expected to commence in late 2027 and an operating life of up to 35 years. Because no reported construction cost was located, capex was not estimated from benchmarks here. O&M and other operating assumptions were not separately sourced and remain unset. The project is currently in NSW Planning Portal 'Prepare EIS' status.

Sources