Wind · West Coast Renewable Energy · Wind Turbine - Onshore
14 Jun 2026 03:35 → 15 Jun 2026 03:35 AEST
| Capex total (greenfield) |
$348.10M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$4.43M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$29,536
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No project-specific greenfield capex or commissioning date could be verified from the searched sources. Used AEMO 2024 onshore wind benchmark O&M and a server-side fallback only for variable O&M. The AEMO 2024 review states fixed O&M cost for wind is AUD 28,000/MW-year and total annual O&M is AUD 17.36 million for the reference 620 MW plant, implying the same per-MW basis. Derwent Valley is listed as a Tasmania location factor in the AEMO review, but that does not constitute a plant-specific capex or O&M quote.