Derwent Valley Wind Farm

Wind · West Coast Renewable Energy · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
150 MW
Researched capacity
Est. SRMC
$0.53/MWh
Key information
Capacity (AI)
150 MW

AEMO spreadsheet entry for Derwent Valley Wind Farm shows 150.00 MW; no reliable public project announcement was found in the provided results to verify an alternate figure.

AEMO status Publicly Announced
Project status Development (AI)

AEMO spreadsheet lists the asset as Publicly Announced, which aligns with a pre-construction / development phase.

Coordinates

DUID
Owner West Coast Renewable Energy
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Equipment confidence low
Stats window
14 Jun 2026 01:55 → 15 Jun 2026 01:55 AEST

Dispatch & revenue

14 Jun 2026 01:55 → 15 Jun 2026 01:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
150 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$348.10M

Shown in table
$348.10M (2026 real AUD)

Reported / source value
$330.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$4.43M

Shown in table
$4.43M (2026 real AUD)

Reported / source value
$4.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The AEMO reference wind project total annual O&M is AUD 17.36 million; this is not site-specific, but supports the per-MW benchmark.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 07 Jun 2026

Fixed OPEX / MW-yr
$29,536

Shown in table
$29.5k (2026 real AUD)

Reported / source value
$28.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO 2024 review gives the fixed O&M benchmark for onshore wind at AUD 28,000 per MW per year.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 07 Jun 2026

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No verified plant-specific or AEMO onshore-wind variable O&M value was located in the searched sources, so the supplied fallback was used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
No project-specific greenfield capex or commissioning date could be verified from the searched sources. Used AEMO 2024 onshore wind benchmark O&M and a server-side fallback only for variable O&M. The AEMO 2024 review states fixed O&M cost for wind is AUD 28,000/MW-year and total annual O&M is AUD 17.36 million for the reference 620 MW plant, implying the same per-MW basis. Derwent Valley is listed as a Tasmania location factor in the AEMO review, but that does not constitute a plant-specific capex or O&M quote.