Wind · Delburn Wind Farm Pty Ltd · Wind Turbine - Onshore
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST
| Capex total (greenfield) |
$665.98M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,057,776
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$12.64M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific capital expenditure was reported by SEC as around $650 million for the 33-turbine, 205 MW Delburn Wind Farm; this is the best available project-specific capital figure and is used in preference to technology benchmarks. Note: the user-provided capacity of 217.8 MW differs from the project pages and SEC fact sheet, which state 205 MW; capex_per_mw_aud is calculated using the user-provided 217.8 MW capacity as requested. Construction is expected to begin in early 2026 and the project to be operational in 2028. Asset life assumed from project FAQ / SEC materials is 35 years.