Solar · Ib vogt Development Australia Pty Ltd · Solar PV - Fixed
01 Jun 2026 00:00 → 17 Jun 2026 21:55 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,127,049
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.48M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$12,295
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Project website and NSW planning documents describe Deepwater as a proposed 120 MW (AC) hybrid solar farm with a 120 MW / 480 MWh battery, currently in development and with approvals anticipated in 2027. No project-specific greenfield total investment/capex figure was found in the searched owner, planning, or public sources, so capex remains unfilled. O&M values use AEMO/Aurecon 2024 solar PV cost and technical parameter review for a 20 MW ground-mount solar PV plant as the closest benchmark; the report gives fixed O&M of $12,000 per MWp-year and indicates variable O&M is included in fixed O&M. Battery-related costs were not added because the user requested solar_fixed normalisation and no separate plant-specific solar-only capex was found.