Deepwater Solar Farm

Solar · Ib vogt Development Australia Pty Ltd · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

No public build/commissioning/operating evidence found in supplied results; asset is described as publicly announced and not yet confirmed under construction.

Coordinates

DUID
Owner Ib vogt Development Australia Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
16 Jun 2026 20:50 → 17 Jun 2026 20:50 AEST

Dispatch & revenue

16 Jun 2026 20:50 → 17 Jun 2026 20:50 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$1,127,049

Shown in table
$1.13M (2026 real AUD)

Reported / source value
$1.10M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$1.48M

Shown in table
$1.48M (2026 real AUD)

Reported / source value
$1.44M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$12,295

Shown in table
$12.3k (2026 real AUD)

Reported / source value
$12.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provides the benchmark fixed O&M used as fallback for solar PV.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 07 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Interpreted as zero separate variable O&M for the fallback profile.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (medium confidence)
Source recorded 07 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
Project website and NSW planning documents describe Deepwater as a proposed 120 MW (AC) hybrid solar farm with a 120 MW / 480 MWh battery, currently in development and with approvals anticipated in 2027. No project-specific greenfield total investment/capex figure was found in the searched owner, planning, or public sources, so capex remains unfilled. O&M values use AEMO/Aurecon 2024 solar PV cost and technical parameter review for a 20 MW ground-mount solar PV plant as the closest benchmark; the report gives fixed O&M of $12,000 per MWp-year and indicates variable O&M is included in fixed O&M. Battery-related costs were not added because the user requested solar_fixed normalisation and no separate plant-specific solar-only capex was found.